Tarpon Specialty Services is seeking experienced structural welders to qualify on a vertical structural plate welding test. This qualification is designed to verify advanced welding skills, including full-penetration welds, multi-pass technique, and proper back-gouging practices on thick structural material.
Welding Process: Flux-Cored Arc Welding (FCAW) only
Test Overview
Material: 1-1/2” structural plate
Joint Type: T-joint
Joint Preparation: Double-beveled vertical plate welded into a 1-1/2” base plate
Position: Vertical (3G configuration)
Welding Sequence
Fit and tack the joint in place
Weld the first side using a root pass, hot pass, and three (3) fill passes
Flip to the back side and back gouge to clean, sound metal
Present the back-gouged joint to the inspector for approval
Weld out the back side of the joint
Return to the front side and complete the final weld-out
Skills This Test Confirms
Ability to weld thick structural plate in the vertical position
Proper execution of multi-pass welding techniques
Correct back-gouging practices to achieve full penetration
Understanding of inspection hold points and weld quality requirements
Capability to produce code-quality structural welds without assistance
This qualification is intended for experienced structural welders who are comfortable working with heavy material, following procedures, and meeting inspection standards.
- Department
- WELDING
- Locations
- Ingleside
About Tarpon Specialty Services
Tarpon Motto: "This is the last job you will have to look for."
Tarpon Specialty Services wants to introduce you to the company that genuinely respects and cares for all the Men and Women that make it a great company. Welcome and we look forward to meeting you soon.